05 Nov 2019

Final Concrete Pour on Metrolink Trafford Park line

(Left) Barry Flutter, Senior Project Manager for contractor M-PACT Thales, (right) Danny Vaughan, TfGM Head of Metrolink

CB_TFGM_051119_0001.JPG (5605px * 3737px - 1.17 MB)

Download
Final Concrete Pour on Metrolink Trafford Park line: (Left) Barry Flutter, Senior Project Manager for contractor M-PACT Thales, (right) Danny Vaughan, TfGM Head of Metrolink